Digital Library
Digital Library
HomeBrowseMapSearch
Sign in
  1. Library
  2. ICT Field Guide Vol I
  • Home
  • Browse
  • Map
  • Search
  • Preface
  • ICT Installation Practices Field Guide - Volume 1 - General Cabling - 2nd Edition
    Chapter

    Preface

    3 min read659 words

    ICT Installation Practices Field Guide - Volume 1 - General Cabling - 2nd Edition · Vol. I, No. 1

    • Copper Cabling
    • Fiber Optics
    • Standards & Compliance

    This content cannot be printed or saved as a PDF. Read it online in the BICSI Digital Library.

    ICT Installation Practices Field Guide Volume 1 -General Cabling 2 nd Edition

    This field guide is not intended to be used for BICSI ® testing or credentialing purposes but is meant to be used in the field by BICSI's installers and technicians as a handy reference for both copper and optical fiber cable general installation applications.

    BICSI ®, Tampa, FL 33637

    © 2023 BICSI ®

    All rights reserved.

    Second edition published 2023

    First printing July 2023

    Printed in the United States of America

    All rights reserved

    ISBN (Print): 978-1-928886-97-6

    ISBN (Electronic): 978-1-928886-98-3

    All brand names, trademarks, and registered trademarks are the property of their respective holders.

    No part of this publication may be used, reproduced, or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by any information storage and retrieval system, without prior agreement and written permission from BICSI. The contents of this publication are subject to revision without notice due to continued progress in ICT installation methodology.

    THIS PUBLICATION IS SOLD AS IS, WITHOUT WARRANTY OF ANY KIND, RESPECTING THE CONTENTS OF THIS PUBLICATION, INCLUDING BUT NOT LIMITED TO IMPLIED WARRANTIES FOR THE PUBLICATION'S QUALITY, PERFORMANCE, MERCHANTABILITY, OR FITNESS FOR ANY PARTICULAR PURPOSE. BICSI SHALL NOT BE LIABLE TO THE PURCHASER OR ANY OTHER ENTITY WITH RESPECT TO ANY LIABILITY, LOSS, OR DAMAGE CAUSED DIRECTLY OR INDIRECTLY BY THIS PUBLICATION.

    We welcome all comments about this publication. If you have any questions about this publication, or BICSI and its services, please contact our office.

    BICSI World Headquarters

    8610 Hidden River Parkway

    Tampa, FL 33637-1000 USA

    Tel.: +1 813.979.1991 or

    Tel.: 800.242.7405 (USA & Canada toll-free)

    Fax: +1 813.971.4311

    E-mail: bicsi@bicsi.org

    Website: www.bicsi.org

    WARNING

    It is the responsibility of the user of this publication to determine the use of the applicable safety and health practices associated with ICT cabling installation practices. BICSI shall not be liable to the purchaser or any other entity with respect to any liability, loss, or damage caused directly or indirectly by application or use of this publication. This publication is not a single source document but a compendium of many sources of ICT industry-related practices, processes, and procedures. The information contained in this publication includes, but is not limited to, national and international codes, de jure and de facto standards, and industry-accepted best practices. BICSI recommended best practices are industry established best practices and not specifically developed by BICSI. When necessary, BICSI will select and recommend widely used and acceptable methods for the performance of a particular task or process based on numerous factors, including, but not limited to, widespread field acceptance, manufacturer's recommended methods, and safety.

    This publication does not address safety issues associated with its use.

    Acknowledgments

    Thank you for ordering the 2nd edition of BICSI's ICT Installation Practices Field Guide: Volume 1 – General Cabling. The officers of BICSI are pleased to provide an up-to-date field guide that offers proven guidelines and installation methods accepted by the ICT industry.

    BICSI's Technical Information and Methods (TI&M) Committee serves to coordinate the information within all BICSI technical publications:

    TI&M Chair:

    Robert B. "Bob" Hertling Jr.,

    RCDD, OSP;

    South County Systems Consulting, LLC

    TI&M Vice-Chair:

    Philip W. Janeway,

    RCDD;

    Rack Bunker Data Center, LLC

    TI&M Secretary:

    John Romanski

    OSP, WD, ESS, DCDC, RTPM; Precision Contracting Services, Inc.

    Bob Hertling, as publication SMETL, spearheaded the difficult task of extracting this field guide's information from BICSI's Information Technology Systems Installation Methods Manual (ITSIMM). That information was condensed into this right-sized field guide. BICSI greatly appreciates the strong commitment of Bob's subject matter expert team: Jacob Dyas, David Houtz, Phil Janeway, and Sean O'Hara.

    Field Guide SMETL: Robert B. Hertling Jr., RCDD, OSP; South County Systems Consulting, LLC

    BICSI's Vice President of Professional Development: Penni Ferguson

    BICSI's Director of Publications: Clarke W. Hammersley

    Field Guide Project Manager/Lead Technical Editor: Jeffrey Giarrizzo

    Field Guide Senior Publications Designer: John Ditzel

    Field Guide Technical Editor: Allen Dean

    More on these subjects

    • Extended-Reach Structured Cabling: Applying Engineered Guidance Beyond the 100-Meter Channel
      Members
      ICT Today — April/May/June 2026 (Vol. 47, No. 2) · April 2026Also filed under: Copper Cabling, Standards & Compliance
    • Message from the Board Chair
      Members
      ICT Today — April/May/June 2026 (Vol. 47, No. 2) · April 2026Also filed under: Copper Cabling, Fiber Optics
    • The Role of Ongoing Optical Fiber Testing in Maintaining Reliable Networks
      Members
      ICT Today — April/May/June 2026 (Vol. 47, No. 2) · April 2026Also filed under: Fiber Optics, Standards & Compliance
    • The Weakest Link: Exposing the Dangers of Non-Compliant 8P8C (RJ45) Connectivity
      Members
      ICT Today — April/May/June 2026 (Vol. 47, No. 2) · April 2026Also filed under: Copper Cabling, Standards & Compliance
    • Structured Cabling—Twisted Pair Shielding: What is Best?
      Members
      ICT Today — July/August/September 2024 (Vol. 45, No. 3) · July 2024Also filed under: Copper Cabling, Standards & Compliance

    On this page

    1. ICT Installation Practices Field Guide Volume 1 -General Cabling 2 nd Edition
    2. BICSI World Headquarters
    3. WARNING